Design-Build and Design-Build RFP Authoring
|
Project |
Description |
Owner |
Date |
Estimated Construction Cost |
|
New Fleet Store & MWR Outdoor Gear Facility Pearl Harbor, Hawaii |
A design-building acquisition for design and construction of a new one-story, 24,000 sf facility combining a NEX Fleet Store with a MWR facility. ATFP compliance, structural engineering, and construction administration services. Combining a Fleet Store and Outdoor Gear Facility in an approximately 24,000 sf building. |
NAVFAC Hawaii; PCO/ACO AE & Construction Division |
2009 |
|
|
Child Development Center for Ages 6-10 Schofield Barracks
Central Oahu, Hawaii |
A new child development center within a controlled perimeter. A center for 195 children in a 23,000 sf, one-story building, approximately 23,000 sf area. Design-builder’s ATFP compliance engineer for design team. |
U.S. Army Corps of Engineers, Honolulu District |
2008 |
|
|
Renovate Buildings 1923 and 1924 for Child Development Center
Pearl Harbor, Hawaii |
N62742-01-C-1343 Building 1923 at Naval Station Pearl Harbor is being modified from its current office use. A design-build project. Evaluation and report on basis of design, and blast resistant specifications. Develop ATFP structural and cladding loading criteria. Performed specific blast analysis of structural and glazing components; review and assess existing conditions; specifications and documentation summary. |
Dept. of the Navy, Naval Facilities Engineering Command, Hawaii |
2008 |
|
|
New Youth Center Marine Corps Base Hawaii
Kaneohe, Hawaii |
ATFP Consulting Structural Engineering Services covering technical criteria and compliance specific to this new one-story, 20,715 sf building which is located within a controlled perimeter. |
Dept. of the Navy, Naval Facilities Engineering Command, Hawaii |
2009 |
|
|
Keaukaha Military Reservation Joint Military Center
Phase I
Island of Hawaii, Hawaii |
Structural engineering design and construction services of approximately 105,600 sf of buildings. These buildings will service the Army National Guard, U.S. Army Reserve, and Hawaii Office of Veteran Services and is situated on a 15.5 acre site within the Keaukaha Military Reservation near Hilo Airport. ATFP technical criteria and compliance services specific to these buildings are also provided. |
State of Hawaii Dept. of Accounting and General Services |
2009 |
|
|
Security Improvements at the Lower Bravo Area (Gate 19) NAVSTA
Pearl Harbor, Hawaii |
ATFP Consulting and Structural Engineering Design Services to provide counter-terrorism improvements to the pier entry facilities while reducing the number of sentry man-hours required. |
Dept. of the Navy, Naval Facilities Engineering Command, Hawaii |
2009 |
|
|
BEQ Buildings 14 / 15
Naval Station, Guam |
A Design-Bid-Build project. Initial Functional Analysis Concept Design and complete structural design of a new 2-story 30,000 sf living space barracks compliance with ATFP standards. |
Dept. of the Navy, Pacific Division NAVFACENGCOM |
2004 |
$11.5 M |
|
Pu`ukohola Heiau National Historic Site
Kawaihae, Hawaii |
Design-Build of a Maintenance Facility. | National Park Service | 2003 | |
|
Ford Island Navy Lodge
Pearl Harbor, Hawaii |
Design-Build RFP for renovation and conversion of Building 78 and construction of a new lodge building. | Dept. of the Navy Pacific Division, NAVFACENGCOM | 2001 |
$18M |
|
Navy Marine Golf Course Clubhouse
Honolulu, Hawaii |
Design-Build of a new two-story, 14,000 sf steel-framed clubhouse. | Dept. of the Navy Pacific Division, NAVFACENGCOM | 2000 |
$5M |
|
BEQs P438 and P439 MCBH
Kaneohe, Hawaii |
First design-build BEQ project for PACDIV NAVFACENGCOM - Participated in the FACD and preparation of RFP design-build documents for these two new construction BEQ projects consisting of 640 equivalent spaces. | Dept. of the Navy Pacific Division NAVFACENGCOM Pearl Harbor, Hawaii | 1999 |
$34.4 M |
|
BEQ 286 MCBH
Kaneohe, Hawaii |
Participated in the FACD and preparation of RFP design-build documents for this new BEQ project consisting of 408 equivalent spaces. | Dept. of the Navy Pacific Division NAVFACENGCOM Pearl Harbor, Hawaii | 2000 |
$ 23.7 M |
|
BEQ 10286 MCBH
Kaneohe, Hawaii |
FACD and preparation of RFP documents for design-build project delivery. | Dept. of the Navy, Pacific Division NAVFACENGCOM | 1998 | |
|
Navy Exchange Distribution Center
Pearl Harbor, Hawaii |
Navy Exchange warehouse facility of 170,000 sq. ft. utilizing the Invitation for Bid (IFB) and Request for Proposal (RFP) Newport design-build process. | Dept. of the Navy Pacific Division, NAVFACENGCOM Pearl Harbor, Hawaii | 1996 |
$ 12.5 M |
|
Navy Housing Project (300 Units) PWC
Guam Naval Station |
This project involved site surveys, topographic surveys, geotechnical analysis, design charrettes involving concept and schematic design, development of cost estimates, and value engineering in preparing Invitation to Bid (IFB) documents utilizing the Request for Proposal (RFP) design-build method. | Dept. of the Navy Pacific Division, NAVFACENGCOM Pearl Harbor, Hawaii | 1995 |
$ 45 M |
|
Hawaii Convention Center Design-Build Competition Aloha Motors Site
Waikiki, Hawaii |
Schematic design of a proposed precast concrete-framed convention center for Charles Pankow Builders, Ltd. | State of Hawaii | 1994 |
