Housing
| Project | Description | Owner | Date |
Estimated Construction Cost |
|
Kim Residence
Kailua, Hawaii |
A new two-story, 5,400 sf addition built adjacent to the existing home, with a new 1,200 sf garage to accommodate 5 cars. | Dr. and Mrs. Howard Kim | 2009 |
$2M |
|
Ing Residence
Honolulu, Hawaii |
Feasibility study of two existing pole houses, including schematic design criteria and primary vertical support layout for the structural system. | David Ing | 2008 | |
|
Omori Residence Penthouse at the Lanikea
Waikiki, Hawaii |
Installed a new 200 sf mezzanine below the steel-framed hip roof constructed of steel and concrete. The configuration requires strengthening of the supporting steel members. | 2008 | ||
|
Nakagawa Residence Penthouse at the Lanikea
Waikiki, Hawaii |
Installed a new stair constructed of steel and concrete to the mezzanine of a two-story unit penthouse and extend the edge of slab into the existing upper mezzanine floor opening. | 2008 | ||
|
BEQ Buildings 14 and 15
Naval Station, Guam |
Initial Functional Analysis Concept Design and complete structural design of a new 2-story 30,000 sf living space barracks compliance with ATFP standards. | Dept. of the Navy, Pacific Division NAVFACENGCOM | 2004 |
$11.5 M |
|
Waihuna Village
Ewa, Hawaii |
A total of 67 units consisting of 48 single family two-story residences of three types and 19 two-story duplex townhomes. All buildings are slab-on-grade and constructed of metal stud walls, wood floor framing with plywood sheathing, and roofs utilize pre-engineered wood trusses. | Waihuna Joint Venture | 2003 | |
|
Kulaokahu Homeless Elderly Housing
Honolulu, Hawaii |
A 4-story concrete and masonry framed apartment building. | State of Hawaii Housing Authority | 1992 |
$2 M |
|
Ocean Pointe Housing
Ewa Marina, Hawaii |
Phased development of single and multi-family residences utilizing light-gage steel framing. | Haseko (Hawaii), Inc | 1999 |
$60 M |
| Gentry Homes | Single family residences utilizing light-gage steel framing. | Gentry Companies | 1995 | |
| Taman Dayu Indonesia | Master planned resort community | P.T. Taman Dayu | 1995 | |
|
BEQ 10286 MCBH
Kaneohe, Hawaii |
FACD and preparation of RFP documents for design-build project delivery | Dept. of the Navy, Pacific Division NAVFACENGCOM | 1998 | |
|
BEQs P438 and P439 MCBH
Kaneohe, Hawaii |
Participated in the FACD and preparation of RFP design-build documents for these two new construction BEQ projects - Project consisted of 640 equivalent spaces. First design-build BEQ project for PACDIV NAVFACENGCOM | Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii | 1999 |
$34.4 M |
|
BEQ 286 MCBH
Kaneohe, Hawaii |
Participated in the FACD and preparation of RFP design-build documents for this new BEQ project. Project consists of 408 equivalent spaces. | Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii | 2000 |
$ 23.7 M |
|
Navy Housing Project (300 Units) PWC
Guam Naval Station, Guam |
This project involved site surveys, topographic surveys, geotechnical analysis, design charrettes involving concept and schematic design, development of cost estimates, and value engineering preparing invitation to Bid (IFB) documents utilizing the Request for Proposal (RFP) design-build method. | Dept. of the Navy Pacific Division, Naval Facilities Engineering Command Pearl Harbor, Hawaii | 1995 |
$ 45 M |
|
BEQ P-253
San Diego, California |
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command San Bruno, California | 1987 |
$16.6 M | |
|
Unaccompanied Enlisted Personnel Housing
Mugu, California |
Dept. of the Navy Pacific Division, Naval Facilities Engineering Command San Bruno, California | 1985 |
$8 M |
