Infrastructure / Waterfront

Project Description  Owner
Bravo 2 Pier Waterfront Facility and Mechanical Shop Consolidation
Pearl Harbor, Hawaii
The project consists of the design and construction of a 218,000 sq. ft. waterfront facility in existing Buildings 67, 67A, and 67B for ship maintenance work, including consolidation of interior shop spaces, renovation and upgrade of interior office spaces, conversion of shop spaces to offices and training rooms, new and replacement elevators, conversion of naturally ventilated spaces to air conditioned space, prefabricated enclosures, emergency generator, and fire pumps with enclosures. Department of the Navy, PACDIV Naval Facilities Engineering Command Pearl Harbor, Hawaii
COMNAVMARIANAS RSIP Waterfront Facilities Functional Plan
Apra Harbor, Guam
Involved a structural condition survey of wharves and pier and dock fittings, an evaluation of four buildings within the ship repair facility waterfront area, and strengthening and feasibility studies for the Department of the Navy, PACDIV. Dept. of the Navy Pacific Division, Naval Facilities Engineering Command
Yokosuka Naval Complex Waterfront Study
Japan
Structural Condition Assessment of Fixed Mooring Facilities. Heavy weather mooring evaluation. Dept. of the Navy Pacific Division, Naval Facilities Engineering Command
Hilton Hawaiian Village Catamaran Pier and Dock
Waikiki, Hawaii
  • Restoration (1994): Corrosion damage repairs of catamaran pier, including the repair of existing post tensioned concrete beams.
  • Structural Condition Review/Report (2000)
  • Structural Repairs (2002): Design and construction documents for the repair and rehabilitation of the corroded original pier slab and beams.
  • Structural Condition Review/Report (2004): Conducted an updated survey of existing structural conditions initially documented in 2002.
  • Structural Repairs (2005): Revise the 2002 contract documentation of Owner-authorized-scope repair/renovation structural drawings and specifications incorporating additional rehabilitation work items.
Hilton Hotels Corporation
Water Storage Tanks 0.50, 0.10, 1.0 MG Tanks
Kaupulehu, Hawaii
Kaupulehu Hotel Venture Beverly Hills, CA
Hemmeter Hanger Honolulu International Airport
Honolulu, Hawaii
Hemmeter Aviation Honolulu, Hawaii
Queen Kaahumanu Highway Bridge
South Kohala, Hawaii
Concept design through contract documents and construction administration of Queen Kaahumanu Highway bridge/underpass. Also performed concrete and rebar inspection. State of Hawaii Dept. of Transportation Hawaii County Division
Guam Airport Aprons 11-13
Agana, Guam
New concrete aprons and supporting retaining walls.
Ford Island Causeway 
Pearl Harbor, Hawaii
Provided feasibility studies for the operable span.
Sewage Treatment Plant
Hapuna, Hawaii
Mauna Kea Properties South Kohala, Hawaii
Tahiti Hotel Highway overpass footbridge.
Guam Navy Family Housing Wave Protection Wall
Waipio Peninsula Soccer Park
Waipahu, Hawaii
Pump stations and irrigation line utility bridge. City and County of Honolulu