Master Planning / Feasibility Studies

Project
Firm's Responsibility
Owner
Date
Estimated Construction Cost
Planning Study for Phases 1 to 4, Command and Control Facility Complex
Fort Shafter, Hawaii
Conceptual design planning study for implementation of concepts identified in the standard design criteria and to provide sufficient information for the Army to negotiate a separate design contract due to Congressional funding restrictions. The goal for this project is to achieve a LEED Gold rating.
U.S. Army Corps of Engineers Fort Shafter, Hawaii
2009
 
Edmondson Hall and Snyder Hall Feasibility Studies University of Hawaii-Manoa
Honolulu, Hawaii
Feasibility Studies for Edmondson Hall, an existing 4-story reinforced concrete structure of approximately 42,500 sf, and Snyder Hall, an existing 5-story reinforced concrete structure of approximately 60,000 sf, to determine the best use for these buildings. The studies consisted of analyzing three options for each building in addition to providing cost estimates for each option. Both buildings were built around.
State of Hawaii Dept. of Accounting and General Services
2008
 
Panoramic Survey Telescope and Rapid Response System (Pan-STARRS)
Mauna Kea, Hawaii
Engineering feasibility study of “common enclosure” concept for a four-telescope array which would reside within the footprint of existing 88-inch telescope that will be demolished.
University of Hawaii
Institute of Astronomy
2006
 
Physical Fitness Center P-006, MCBH
Camp Smith, Hawaii
New construction of fitness facility including open spaces playing courts, spectator seating, administration offices, and supporting facilities such as building utility connections, site improvements and ATFP security measures.
Dept. of the Navy PACDIV, Naval Facilities Engineering Command
2005
$8M
Consolidated Nuclear Work Facility Study Buildings 5 and 9
Pearl Harbor, Hawaii
Review of existing buildings for structural integrity.
Dept. of the Navy PACDIV, Naval Facilities Engineering Command
2004
 
Building 155 Pearl Harbor Naval Shipyard & IMF, MCON P-210
Pearl Harbor, Hawaii
Review for structural integrity of approximately 190,000 sf, 75-ft. high.
Dept. of the Navy PACDIV, Naval Facilities Engineering Command
2003
 
Guam RSIP Waterfront Facilities Functional Plan
Apra Harbor, Guam
Structural Condition Assessment of fixed mooring facilities and four buildings within the ship repair facility waterfront area.
Dept. of the Navy PACDIV, Naval Facilities Engineering Command
2003
 
CNO Demolition Environmental Assessment Hawaii Structural assessment and rehabilitation design of 6 buildings for reuse option planning and environmental assessment. Dept. of the Navy PACDIV, Naval Facilities Engineering Command 2002
Buildings 208 and S169
Pearl Harbor, Hawaii
Structural evaluation and rehabilitation of representative historic buildings for cost estimation and planning. Dept. of the Navy PACDIV, Naval Facilities Engineering Command 2002
Integrated Cultural Resources Management Plan
Pearl Harbor, Hawaii
Structural evaluation and rehabilitation of representative historic buildings for cost estimation and planning. Dept. of the Navy PACDIV, Public Works Division Makalapa, Hawaii 2000
Kalaupapa National Historic Park Historic Buildings Preservation
Molokai, Hawaii
Condition survey and restoration cost evaluation of 31 buildings for the National Park Service. National Park Service 2000

$4 M

Yokosuka Naval Complex Waterfront Study
Japan
Structural condition assessment of Fixed Mooring Facilities. Heavy weather mooring evaluation. Dept. of the Navy PACDIV, Naval Facilities Engineering Command 2001
Schofield Barracks Master plan for Unaccompanied Enlisted Personnel Housing
Schofield Barracks, Hawaii
Master planning of whole barracks renewal for unaccompanied enlisted personnel housing - Structural survey and evaluation of existing post World War I barracks. U.S. Army Corps of Engineers U.S. Army Engineer District, Honolulu 1996

$80 M

Marine Barracks Historic Preservation Plan
Pearl Harbor, Hawaii
Field investigation, design review and evaluation of 8 historic Marine Barracks buildings for conversion to office occupancy. Dept. of the Navy, PACDIV Public Works, Division, Makalapa 1994

$17 M

Hilton Hawaiian Village Master Plan Renovation
Waikiki, Hawaii
Engineering studies to support master planning of major renovations and additions. Hilton Prudential Joint Venture 1984

$70 M

Embassy Center Ho Chi Minh City, People's Republic of Vietnam Concept design for a high rise, mixed use commercial project containing a five star hotel, office buildings, condominiums, retail and parking facilities; total area of approximately 1,500,000 sq. ft. Fujita & Associates 1995

$150 M - $175 M

Hawaii Newspaper Agency
Honolulu, Hawaii
Assessment of existing facilities and feasibility studies as part of a master plan for the newspaper facility. Hawaii Newspaper Agency 1997
Navy Housing Project (300 Units) PWC
Naval Station, Guam
Master plan and site engineering study. Dept. of the Navy, PACDIV, Naval Facilities Engineering Command 1993

$45 M

Ford Island Operable Causeway
Pearl Harbor, Hawaii
Feasibility Study. Dept. of the Navy, PACDIV, Naval Facilities Engineering Command 1989

$60 M

Moanalua Shopping Center Feasibility Study
Honolulu, Hawaii
Existing conditions study and engineering evaluation to support master planning in proximity to the Pearl Harbor Naval Exchange. Dept. of the Navy, PACDIV, Naval Facilities Engineering Command 1996
DFS Store Addition Hilton Hawaiian Village
Waikiki, Hawaii
Engineering feasibility study on adding a two-story 80,000 sq. ft. retail facility over existing ballrooms and back of house facilities. Duty Free Shops 1995
Waterfront Place at Aloha Tower
Honolulu, Hawaii
A large private mixed-use waterfront development proposal involving retail, office, hotel, cruise ship terminals, and condominium buildings. Waterfront Partners 1989

$1,100 M

Aiea Sugar Mill
Aiea, Hawaii
Developed as-built documentation and engineering and feasibility studies to support a master plan for converting an abandoned 80-year-old sugar mill to a production facility and offices for Crazy Shirts, Inc. Crazy Shirts, Inc. 1994

$10M

Hawaii Convention Center Design Build Competition
Honolulu, Hawaii
Schematic design of a proposed precast concrete-framed convention center for Chares Pankow Builders, Ltd. State of Hawaii Convention Center Authority 1994

$200 M

Waikiki Convention Center at the Ala Wai Gateway Site
Waikiki, Hawaii
Feasibility Engineering Studies and schematic design - 1,160,000 sq. ft. facility - Quantity survey. Outrigger Hotels Hawaii 1992

$180 M

Waikiki International Convention Plaza International Marketplace
Waikiki, Hawaii
Feasibility Engineering Studies and schematic design - 4,700,000 sq. ft. facility including a convention center, two high rise hotels and a high-rise condominium. Waikiki International Plaza Joint Venture 1989

$925 M

Hawaii Theatre Stage Expansion
Honolulu, Hawaii
Engineering feasibility and schematic design for a multi-story expansion of the stage area. Hawaii Theatre 1999
Waikiki Royal Walk
Waikiki, Hawaii
Engineering feasibility study of major alterations of the existing parking structure to allow greater continuity between adjacent retail buildings on two separate street frontages. Consolidated Theatres 1998